Production Scheduling Optimization of Prefabricated Building Components Based on DDE Algorithm
نویسندگان
چکیده
At present, the prefabricated construction industry is in a situation of increasing types components and generally high production costs. A hybrid optimization model considering continuity discreteness for fabricated concrete members established to minimize costs through analysis characteristics precast members. Under premise fully staffing constraints, process period special time limits component production, arrangement are rationalized optimized. discrete differential evolution (DDE) algorithm introduced such NP-hard problems. The double genetic chromosome coding mode active scheduling decoding method adopted. Based on improved POX (Precedence Operation Crossover) cross-evolution method, global operation carried out, an interchange-based local search continuous work penalty mechanism designed find optimal solution. experimental results verify practicality effectiveness algorithm.
منابع مشابه
An improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling
Integration of production planning and scheduling is a class of problems commonly found in manufacturing industry. This class of problems associated with precedence constraint has been previously modeled and optimized by the authors, in which, it requires a multidimensional optimization at the same time: what to make, how many to make, where to make and the order to make. It is a combinatorial,...
متن کاملConstruction scheduling using Genetic Algorithm based on Building Information Model
This is a PDF file of an unedited manuscript that has been accepted for publication. As a service to our customers we are providing this early version of the manuscript. The manuscript will undergo copyediting, typesetting, and review of the resulting proof before it is published in its final form. Please note that during the production process errors may be discovered which could affect the co...
متن کاملOperation Scheduling of MGs Based on Deep Reinforcement Learning Algorithm
: In this paper, the operation scheduling of Microgrids (MGs), including Distributed Energy Resources (DERs) and Energy Storage Systems (ESSs), is proposed using a Deep Reinforcement Learning (DRL) based approach. Due to the dynamic characteristic of the problem, it firstly is formulated as a Markov Decision Process (MDP). Next, Deep Deterministic Policy Gradient (DDPG) algorithm is presented t...
متن کاملOptimal Scheduling of Coordinated Wind-Pumped Storage-Thermal System Considering Environmental Emission Based on GA Based Heuristic Optimization Algorithm
The integration of renewable wind and pumped storage with thermal power generation allows for dispatch of wind energy by generation companies (GENCOs) interested in participation in energy and ancillary services markets. However, to realize the maximum economic profit, optimal coordination and accounting for reduction in cost for environmental emission is necessary. The goal of this study is to...
متن کاملProduction Scheduling of Batch Processes Based on Adaptive DE Algorithm
Production scheduling problems and traditional differential evolution(DE) are analyzed in this paper. Taking the minimum of total completion time as the objective function of production scheduling, a production scheduling model is established for batch processes in process industry.Considering that the performance of the traditional DE algorithm is sensitive to the parameter settings,an adaptiv...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Mathematical Problems in Engineering
سال: 2021
ISSN: ['1026-7077', '1563-5147', '1024-123X']
DOI: https://doi.org/10.1155/2021/6672753