The increased demand for highly customized products and the need shortening lead times competitive advantage has also affected automotive industry. Companies that handle markets in a multi-faced network of demand, like Europe, to be flexible, responsive, follow customer-focused policy. Therefore, there is an automated solutions not only product design but manufacturing section. Such replace manual effort increasing efficiency creating new horizons innovation development. In this paper, mathematical model based on Goal Programming modeling been introduced as part more flexible perspective production scheduling. applied scheduling process company headquartered Germany multi-objective problem cannot. paper will explain how management, time shortening, can solved through properly modified its cause.
منابع مشابه
Multi-Objective Scheduling Problem in a Three-Stage Production System
A three stage production system is considered in this paper. There are two stages to fabricate and ready the parts and an assembly stage to assembly the parts and complete the products in this system. Suppose that a number of products of different kinds are ordered. Each product is assembled with a set of several parts. At first the parts are produced in the first stage with parallel machines a...
متن کاملProduction Scheduling Improvements in an Automotive Sector Company
The paper attempts to overcome the fluctuations occurring in demand of the components in an automotive sector company. Resource and time being the strict constraints, the production is not able to match the pace of the fluctuating demand. So, we introduce some production schedules that help in meeting out the required demand. The merits and demerits of the approaches are also highlighted. Keywo...
متن کاملA multi-objective mathematical model for production-distribution scheduling problem
With increasing competition in the business world and the emergence and development of new technologies, many companies have turned to integrated production and distribution for timely production and delivery at the lowest cost of production and distribution and with the least delay in delivery. By increasing human population and the increase in greenhouse gas emissions and industrial waste, in...
متن کاملmulti-objective scheduling problem in a three-stage production system
a three stage production system is considered in this paper. there are two stages to fabricate and ready the parts and an assembly stage to assembly the parts and complete the products in this system. suppose that a number of products of different kinds are ordered. each product is assembled with a set of several parts. at first the parts are produced in the first stage with parallel machines a...
متن کاملAn algorithm for multi-objective job shop scheduling problem
Scheduling for job shop is very important in both fields of production management and combinatorial op-timization. However, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. The combination of several optimization criteria induces additional complexity and new problems. In this paper, we pro...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IFAC-PapersOnLine
سال: 2021
ISSN: ['2405-8963', '2405-8971']
DOI: https://doi.org/10.1016/j.ifacol.2021.08.204