PRODUCTIVITY ANALYSIS OF EXCAVATOR AND DUMP TRUCK HEAVY EQUIPMENT ON DIGGING AND LOADING WORKS FLOOD CONTROL AFVOER WATUDAKON MOJOKERTO

نویسندگان

چکیده

Heavy equipment is a vital resource in project, but renting heavy costly undertaking. Besides that, project always has constraints that allow the completion time to exceed specified time, and delays will also cause costs incurred increase. So from calculation of productivity equipment, it necessary so tool can work optimally. From analysis results, was found excavators 154.185 m3/Hour. For dump trucks, 37.99 m3/Hour, then calculating duration work. excavators, took 454 Hours, for 263 O'clock. cost value Rp.1,985,200/Day obtained, while Rp.2,578,000/Day

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A robotic excavator for autonomous truck loading

Excavators are used for the rapid removal of soil and other materials in mines, quarries, and construction sites. The automation of these machines offers promise for increasing productivity and improving safety. To date, most research in this area has focussed on selected parts of the problem. In this paper, we present a system that completely automates the truck loading task. The excavator use...

متن کامل

Detection of Dump Truck for Loading Operation by Wheel Loader

The authors have been conducting development of an autonomous loading system by wheel loader. As a part of the development, a detection method of location of the dump truck will be described in this paper. In the process of loading to the truck in the operation, the loader approaches to the dump truck in very close distance. The function for collision avoidance between the loader and the truck ...

متن کامل

Excavator Dynamics and Effect of Soil on Digging

Automation of excavation work calls for a robotic system able to perform the planned digging work, and responsive to interaction forces experienced during excavation. The development of automated excavation control method requires a dynamic model to describe the evolution of the excavator motion with time. The joint torques of the boom mechanism are generated by hydraulic rams which also affect...

متن کامل

effect of seed priming and irrigation regimes on yield,yield components and quality of safflowers cultivars

این مطالعه در سال 1386-87 در آزمایشگاه و مزرعه پژوهشی دانشگاه صنعتی اصفهان به منظور تعیین مناسب ترین تیمار بذری و ارزیابی اثر پرایمینگ بر روی سه رقم گلرنگ تحت سه رژیم آبیاری انجام گرفت. برخی از مطالعات اثرات سودمند پرایمینگ بذر را بر روی گیاهان مختلف بررسی کرده اند اما در حال حاضر اطلاعات کمی در مورد خصوصیات مربوط به جوانه زنی، مراحل نموی، عملکرد و خصوصیات کمی و کیفی بذور تیمار شده ژنوتیپ های م...

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Jurnal Teknik Sipil

سال: 2023

ISSN: ['2621-8429', '1412-3576']

DOI: https://doi.org/10.26418/jtst.v23i2.61025