Profiling causative factors leading to construction project delays in the United Arab Emirates

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The United Arab Emirates

A Unique Demographic Structure The United Arab Emirates (UAE) lies on the Arabian Gulf between Oman and Saudi Arabia. It consists of a union of seven Emirates, namely: Abu Dhabi, Dubai, Sharjah, Ajman, Ra's Al-Khaymah, Al-Fujayrah, and Umm Al-Qaywayn (Fig. 11). The UAE has a cosmopolitan population of 3.7 million (estimates 2003) and exhibits a unique demographic structure as UAE nationals only...

متن کامل

Practices and Attitudes to Prevention of Travel-related Infectious Diseases in United Arab Emirates

Introduction: Among the United Arab Emirates (UAE) population more and more people now consider travelling abroad. This is potentially problematic because travelling enhances exposure between hosts and pathogens and so people that travel are putting their health at risk. This concern makes it necessary that public education is provided to inform people of the risks of travellin...

متن کامل

Emergency medicine in the United Arab Emirates

It has been a decade since emergency medicine was recognized as a specialty in the United Arab Emirates (UAE). In this short time, emergency medicine has established itself and developed rapidly in the UAE. Large, well-equipped emergency departments (EDs) are usually located in government hospitals, some of which function as regional trauma centers. Most of the larger EDs are staffed with medic...

متن کامل

Hemoglobinopathies in the United Arab Emirates.

The use of modern DNA techniques enabled us to characterize and identify 44 distinct beta-thal mutations and nine alpha-thal genotypes in the UAE population. All of the beta-thal mutations were severe beta+ or beta0 types resulting in transfusion-dependent phenotypes. Furthermore, a large number of alphaT alleles in the alpha-thal carriers and in patients with Hb H disease, accentuate the impor...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Engineering, Construction and Architectural Management

سال: 2017

ISSN: 0969-9988

DOI: 10.1108/ecam-05-2015-0072