Project Duration Risk Transmission and Control based on CCPM
نویسندگان
چکیده
منابع مشابه
forecasting project duration by earned duration management and risk management
being observed frequently that projects cannot achieve to their plan duration and their budget. utilizing retrospective method is one of the reasons for this problem. in this research two method, earned duration management and risk management, has been used to remove the gap of the plan and the reality; this enable the project to utilize both high accuracy of the first method and prophecy of th...
متن کاملTheory of Constraints ( TOC ) & Critical Chain Project Mgmt ( CCPM )
Introduction: There is a considerable body of literature on the use of Theory of Constraints and Critical Chain Project Management in Projects, and almost as many acronyms – TOC, CCPM, CCS, CCM, CCS/BM, to name a few. Theory of Constraints was initially controversial and often criticized (see earlier references below) but is now firmly establishing itself, particularly in Risk Management. Often...
متن کاملFlexible resource management and its effect on project cost and duration
In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported ...
متن کاملRisk-adjusted control charts based on LR-fuzzy data
Control charts are widely used in industrial processes as well as in health sciences and particularly for monitoring the performance of cardiac surgeon or a group of surgeons based on the preoperative risk of patients. Since the preoperative risk is a vague and nonprecise variable and the anesthesiologists after checking how many risk factors a patient has, determine the risk of mortality befor...
متن کاملResearch on Risk Element Transmission of Enterprise Project Evaluation Chain Based on Trapezoidal Fuzzy Number FAHP
In this study, a new modeling method based on trapezoidal fuzzy number FAHP has been proposed to solve the problem of risk element transmission in enterprise project evaluation chain. We firstly put forward enterprise project chain risk element transmission and constructs enterprise project chain risk element transmission tetrahedron model and then proposed the theory of enterprise project eval...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Research Journal of Applied Sciences, Engineering and Technology
سال: 2014
ISSN: 2040-7459,2040-7467
DOI: 10.19026/rjaset.7.298