Project Evaluation under Uncertainty

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Bringing social standards into project evaluation under dynamic uncertainty.

Society often sets social standards that define thresholds of damage to society or the environment above which compensation must be paid to the state or other parties. In this article, we analyze the interdependence between the use of social standards and investment evaluation under dynamic uncertainty where a negative externality above a threshold established by society requires an assessment ...

متن کامل

A Reactive Approach for Mining Project Evaluation under Price Uncertainty

Projects in the mining industry are undertaken with the objective of maximizing economic value, which is near-universally measured by the Net Present Value (NPV), considering all capital expenditure and operating cash flow. This industry is usually considered high risk because of historically volatile commodity prices (directly impacting revenues) and the fact that very large capital expenditur...

متن کامل

Project Planning Under Temporal Uncertainty

This paper presents an approach towards probabilistic planning with continuous time. It adopts stochastic concepts for continuous probabilities and integrates them into an HTN-based planning framework. Based on uncertain time durations associated with primitive tasks the time consumption probabilities of non-linear plans can be accumulated and thus an overall probability for a successful execut...

متن کامل

Optimizing Project Prioritization under Budget Uncertainty

We consider a problem commonly faced in the nuclear power industry, involving annual selection of plant capital investments under the constraints of a limited and uncertain budget. When the budget is assumed known, a typical approach to such problems is built on a multi-dimensional knapsack model. This model takes as input the available budget in each year, the stream of liabilities induced by ...

متن کامل

Comparative performance evaluation under uncertainty

In this article CCPR, a multidimensional framework for comparative performance evaluation is proposed, which is elaborated and illustrated through a real-life case. A particular feature of the approach is that it takes account of and corrects for the influence of risks, which are beyond the control of the decision maker. Here risk is seen as a multidimensional measure; it is expressed by means ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: INFRASTRUCTURE PLANNING REVIEW

سال: 1998

ISSN: 0913-4034,1884-8303

DOI: 10.2208/journalip.15.19