Project Management Monitoring Based on Expected Duration Entropy
نویسندگان
چکیده
منابع مشابه
An ex ante control chart for project monitoring using earned duration management observations
In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project’s performance indicators, by plotting them on the S...
متن کاملProject Managers Competencies based on ICB and Project Management Processes based on PMBOK in Project Based Organization (Case study: Hydropower Plants Management)
Effective implementation of managerial systems needs software and hardware requirements. Project management competencies of the managers is one of the most important and inevitable requirements to ensure the success of the projects in any industry. Inorder to clarify the requirements, many international and professional instituts have presented well-known frameworks to help the managers to shap...
متن کاملforecasting project duration by earned duration management and risk management
being observed frequently that projects cannot achieve to their plan duration and their budget. utilizing retrospective method is one of the reasons for this problem. in this research two method, earned duration management and risk management, has been used to remove the gap of the plan and the reality; this enable the project to utilize both high accuracy of the first method and prophecy of th...
متن کاملFlexible resource management and its effect on project cost and duration
In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported ...
متن کاملExpected Duration of Dynamic Markov PERT Networks
Abstract : In this paper , we apply the stochastic dynamic programming to approximate the mean project completion time in dynamic Markov PERT networks. It is assumed that the activity durations are independent random variables with exponential distributions, but some social and economical problems influence the mean of activity durations. It is also assumed that the social problems evolve in ac...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Entropy
سال: 2020
ISSN: 1099-4300
DOI: 10.3390/e22080905