Project management under uncertainty beyond beta: The generalized bicubic distribution

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimization Under Uncertainty Using the Generalized Inverse Distribution Function

A framework for robust optimization under uncertainty based on the use of the generalized inverse distribution function (GIDF), also called quantile function, is here proposed. Compared to more classical approaches that rely on the usage of statistical moments as deterministic attributes that define the objectives of the optimization process, the inverse cumulative distribution function allows ...

متن کامل

The Beta Generalized Exponential Distribution

We introduce the beta generalized exponential distribution that includes the beta exponential and generalized exponential distributions as special cases. We provide a comprehensive mathematical treatment of this distribution. We derive the moment generating function and the rth moment thus generalizing some results in the literature. Expressions for the density, moment generating function and r...

متن کامل

The Beta Generalized Pareto Distribution

A new distribution called the beta-generalized Pareto is proposed. Several properties of this distribution are presented. The expressions for the mean, mean deviation, variance, and entropies are obtained. The method of maximum likelihood is proposed to estimate the parameters of the distribution. The flexibility of this distribution is illustrated in an application to a real data set.

متن کامل

A Multi-level Approach to Project Management under Uncertainty

Project management decisions are made at the strategic, the tactical and the operational level. These decision levels are unarguably interrelated. Uncertainty in project management is primarily dealt with at an operational level by detecting operational risks and deciding on how to respond to them such that the tactical objectives can be met. We stress some major issues regarding the topics of ...

متن کامل

Allocating Time and Resources in Project Management Under Uncertainty

We define and develop a solution approach for planning, scheduling and managing project efforts where there is significant uncertainty in the duration, resource requirements and outcomes of individual tasks. Our approach yields a nonlinear optimization model for allocation of resources and available time to tasks. This formulation represents a significantly different view of project planning fr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Operations Research Perspectives

سال: 2016

ISSN: 2214-7160

DOI: 10.1016/j.orp.2016.09.001