Project Net Present Value estimation under uncertainty

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project Portfolio Selection with the Maximization of Net Present Value

Projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. An integer programming model is formulated for the project portfolio selection and scheduling.Two heuristic algorithms, genetic algorithm (GA) and simulated annealing (SA), are presented to solve the problem. Results of cal...

متن کامل

Net Present Value with Uncertainty

Projects may be evaluated and compared according to the Net Present Value (NPV) of their cash flow. The NPV is the discounted expected revenues minus the costs over the lifetime of the project. Traditional NPV calculations do not take into account the uncertainty in the variables that influence the revenues and costs. We present a simulation approach to incorporate uncertainty in the NPV calcul...

متن کامل

project portfolio selection with the maximization of net present value

projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. an integer programming model is formulated for the project portfolio selection and scheduling.two heuristic algorithms, genetic algorithm (ga) and simulated annealing (sa), are presented to solve the problem. results of cal...

متن کامل

A Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value

This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA).&#10In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have ...

متن کامل

Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources

Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Central European Journal of Operations Research

سال: 2017

ISSN: 1435-246X,1613-9178

DOI: 10.1007/s10100-017-0500-0