Project Risk Assessment Through Construction Sequence Analyses for Industrial Plant Construction Projects
نویسندگان
چکیده
منابع مشابه
Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
متن کاملA MATHEMATICAL MODEL FOR SELECTING THE PROJECT RISK RESPONSES IN CONSTRUCTION PROJECTS
Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and independent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. ...
متن کاملUnderstanding bi-project management: engineering complex industrial construction projects
Engineering large industrial construction projects is usually a complex task involving several co-operating actors. This paper investigates a specific type of such projects, labelled bi-project management. Bi-project management is characterised by two main actors, each of whom manage a part of the project: the owner of the installation (the client organisation) responsible for the engineering o...
متن کاملRisk Assessment for Construction Projects Contracting Based on Unascertained Sets
This paper utilizes unascertained sets to analyze general contracting risk of construction projects. Firstly, principal component method was used to process a number of listed general contracting risk indices. The representative indices from principal component analysis process substitute for the primary indexes. Thus subjective random problem in choosing indices can be avoided. Then, risk fact...
متن کاملBayesian-network-based safety risk assessment for steel construction projects.
There are four primary accident types at steel building construction (SC) projects: falls (tumbles), object falls, object collapse, and electrocution. Several systematic safety risk assessment approaches, such as fault tree analysis (FTA) and failure mode and effect criticality analysis (FMECA), have been used to evaluate safety risks at SC projects. However, these traditional methods ineffecti...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Korean Journal of Construction Engineering and Management
سال: 2013
ISSN: 2005-6095
DOI: 10.6106/kjcem.2013.14.4.140