Project scheduling by FGP to Time-Cost-Quality trade off: construction case study
نویسندگان
چکیده
منابع مشابه
A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملA Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملMulti-Objective Optimization of Construction Project Time-Cost-Quality Trade-off Using Differential Evolution Algorithm
Time and cost are among the important aspects considered for every construction project. Many research approaches have been followed to model time-cost relationship. There is a constant rise in the use of innovative contract methods which provide incentives for maximizing quality. There is an increasing pressure to improve the project performance due to the innovative contracting methods which ...
متن کاملa multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
this paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. the net present value (npv) maximization and making span minimization are this study objectives. and since this problem is considered as complex optimization in np-hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملModeling project time-cost trade-off in fuzzy random environment
In real projects, the trade-off between the project cost and the project completion time, and the environmental uncertainty are aspects of considerable importance for managers. For complex environment with more than one type of uncertainty, this paper presents three types of time–cost trade-off models, in which the project environment is described via introducing the fuzzy random theory. The ex...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Construction Engineering and Project Management
سال: 2014
ISSN: 2233-9582
DOI: 10.6106/jcepm.2014.4.3.053