Project Scheduling Under Partially Renewable Resource Constraints

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Splittable stochastic project scheduling with constrained renewable resource

This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...

متن کامل

Project Scheduling under Resource and Mode Identity Constraints . Part I

A recurring problem in project management involves the allocation of scarce resources to the individual jobs comprising the project. In many situations such as audit-staff scheduling, timetabling, and course scheduling, the resources correspond to individuals (skilled labour). This naturally leads to an assignment-type project scheduling problem, i.e. a project has to be performed by assigning ...

متن کامل

Project Scheduling under Resource and Mode Identity Constraints

A recurring problem in project management involves the allocation of scarce resources to the individual jobs comprising the project. In many situations such as audit-staff scheduling, timetabling, and course scheduling, the resources correspond to individuals (skilled labour). This naturally leads to an assignment-type project scheduling problem, i.e. a project has to be performed by assigning ...

متن کامل

splittable stochastic project scheduling with constrained renewable resource

this paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. if the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. it is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. the ...

متن کامل

Fast Iterative Improvement Methods for Project Scheduling under Partially Renewable Resources

It is well-known that for many project scheduling problems the space AS of active schedules contains at least one optimal solution for each feasible instance, so restricting heuristic construction methods to AS will improve algorithmic efficiency without foresaking the chance to eventually find an optimal schedule. Yet, for some problems such results are not directly applicable. We address one ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Management Science

سال: 1999

ISSN: 0025-1909,1526-5501

DOI: 10.1287/mnsc.45.4.543