Project Scheduling Using Shape Model CBR.

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

a model to solve project scheduling and staff assignment problems

the allocation of human resources to project activities in order to schedule them is one of the closest states to the actual conditions of scheduling problems. but regarding the fact that this problem belongs to the class of np-hard problems; so far the exact methods have only been able to solve the small size problems. in this study, the renewable resources are humans in a way that every staff...

متن کامل

a stochastic model for project selection and scheduling problem

resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. in this study, budget, investment costs and earnings are considered to be stochastic. the objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

an inventory–scheduling model for supply chain of construction project

one of the important problems in project management is lack of available resources in proper time at project site that leads to lack of project implementation in due date. this problem may be lead to time delay in sending resources from suppliers and related origins in supply chain to project site. therfore, to better resources managmenet and also the improvement of supply chain condition, the ...

متن کامل

developing project scheduling model with makespan and robustness objectives

the research on project scheduling has widely expanded over the last few decades. the vast majority of these research efforts focus on exact and suboptimal procedures for constructing a workable schedule, assuming complete information and a static deterministic problem environment. project activities are scheduled subject to both technological precedence constraints and resource constraints, mo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C

سال: 1994

ISSN: 0387-5024,1884-8354

DOI: 10.1299/kikaic.60.3683