Project Value Engineering. Case Study For Th e Construction Project
نویسندگان
چکیده
منابع مشابه
Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
متن کاملE-Government for Construction: The Case of Singapore's CORENET Project
In 1999, the Singapore Government envisioned a need to transform the construction industry through the Construction 21 Blueprint by a strategic vision. In line with the broader plan to develop Singapore into a knowledgedriven economy, this industry aspires to become ‘a World Class Builder in the Knowledge Age’. And earlier, as part of the IT 2000 master plan for Singapore, the Construction Real...
متن کاملProject scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study
Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...
متن کاملThe resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study
Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...
متن کاملValue of Project Management –a Value Assessment Based Case Study for Software Project
The amount of software has increased in several products. Software projects have become more complex and their management requires significant amount of skills from every project manager. The amount of available resources, strict budgets, cost control and need for accurate reporting and documentation as well as good quality are part of every project managers’ life. As business challenges projec...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Zeszyty Naukowe Uniwersytetu Szczecińskiego Finanse Rynki Finansowe Ubezpieczenia
سال: 2017
ISSN: 2450-7741,2300-4460
DOI: 10.18276/frfu.2017.1.85-06