PROPOSAL FOR SECURING A ROCK MASSIF NEAR BEROUN RAILWAY STATION
نویسندگان
چکیده
منابع مشابه
Staff rostering for the station personnel of a railway company
This paper presents a case study commissioned by the Spanish railway carrier Ferrocariles Españoles de Vı́a Estrecha for the annual rostering of work schedules for station personnel. A mixed rostering process is used. The first part of the process is carried out manually with the aid of a spreadsheet and Visual Basic, and consists of designing an initial graphic with 4-week patterns for each sta...
متن کاملA proposal for securing a large-scale high-interaction honeypot
This paper presents the design of a secured highinteraction honeypot. The challenge is to have a honeypot that welcomes attackers, allows userland malicious activities but prevents from system corruption. The honeypot must be scalable to authorize a large amount of malicious activities and to analyze those activities efficiently. The hardening of the honeypot is proposed for two kinds of host. ...
متن کاملRailway station route searching based on ACA
In the railway station signal system, the route searching algorithm is an important software module to realize the function safety of this system. In the paper, the ant colony algorithm is applied to the railway station route searching. Take the specific station route-the Wangzhai Station route for example to search the shortest route. The ideas of the Wangzhai Station route searching are put f...
متن کاملA Robotic Wheelchair Roaming in a Railway Station
In this paper we describe the hardware design and the control, and navigation system of our robotic wheelchair MAid (Mobility Aid for Elderly and Disabled People). Following the advice of disabled people and physicians we did not set out to re-invent and redevelop the set of standard skills of so-called intelligent wheelchairs , such as FollowWall, FollowCorridor, PassDoorway, which are commonl...
متن کاملStability evaluation of a railway timetable at station level
This research deals with a real-world planning problem in railway infrastructure operations. It is part of the RECIFE project, which seeks to develop a decision support software to help evaluate the capacity of a rail junction or station. To this end, the project is working on a timetable optimization model, as well as timetable evaluation modules. This paper presents a module for evaluating ti...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Acta Polytechnica CTU Proceedings
سال: 2018
ISSN: 2336-5382
DOI: 10.14311/app.2018.16.0001