PSO based test case generation for critical path using improved combined fitness function
نویسندگان
چکیده
منابع مشابه
PSO Based Pseudo Dynamic Method for Automated Test Case Generation Using Interpreter
In this paper, we propose a particle swarm optimization (PSO) based hybrid testing technique named as “pseudo dynamic testing” to generate test data for C programs by fulfilling one of the most demanding test adequacy criteria: the all-path testing criterion using an interpreter. The proposed methodology attempts to solve many of the structural testing problems such as dynamic variables, input ...
متن کاملPSO-Based Path Planning Algorithm for Humanoid Robots Considering Safety
In this paper we introduce an improvement in the path planning algorithm for the humanoid soccer playing robot which uses Ferguson splines and PSO (Particle Swarm Optimization). The objective of the algorithm is to find a path through other playing robots to the ball, which should be as short as possible and also safe enough. Ferguson splines create preliminary paths using random generated para...
متن کاملMutation based test case generation via a path selection strategy
Context: Generally, mutation analysis has been identified as a powerful testing method. Researchers have shown that its use as a testing criterion exercises quite thoroughly the system under test while it achieves to reveal more faults than standard structural testing criteria. Despite its potential, mutation fails to be adopted in a widespread practical use and its popularity falls significant...
متن کاملSpecification - Based Test Case Generation Using Dependency
Testing represents a crucial phase in the development of a software system, often requiring considerable effort and resources. Our purpose is to offer a novel approach for generating test cases, based on requirements specification. We make use of scenarios used in the requirements specification phase, taking into consideration the various relationships that can exist between scenarios.
متن کاملThe Generation of Test Data Using Genetic Algorithms and Case Based Reasoning for Safety Critical Systems
The primary aim of the research was to investigate the effectiveness of the approach, which depends on dividing and classifying the specifications in terms of workable pieces, or generic functional modules. For each module defining the pathpredicate representation with an expression in disjunction normal form. This expression is then used to create a genetic template (schema) in a special genet...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of King Saud University - Computer and Information Sciences
سال: 2020
ISSN: 1319-1578
DOI: 10.1016/j.jksuci.2019.09.010