Quantum-Inspired Genetic Algorithm for Resource-Constrained Project-Scheduling

نویسندگان

چکیده

The Resource-Constrained Project-Scheduling Problem (RCPSP) is an NP-hard problem which can be found in many research domains. optimal solution of the RCPSP problems requires a balance between exploration/exploitation and diversification/intensification. With this mind, quantum-inspired evolutionary algorithms' ability to improve population quality solutions, work investigates performance genetic algorithm (QIGA), has been adapted with RCPSPs. proposed QIGA possesses same structure as classical algorithms, but initial updated populations are implemented using quantum gates superposition, bearing mind adaptation such operators fit discrete problems. This aims solve RCPSPs investigate influence various parameters algorithm, size, different options for re-combination use QIGA. well-known PSPLIB benchmark instances J30, J60 J120 activities used test effectiveness It apparent from results that mutation, crossover representation superposition enhances diversity. also outperform other algorithms.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Resource-Constrained Project Scheduling with Genetic Algorithm

The purpose of this paper presents a heuristic method based in genetic algorithms (GA) for resource-constrained project scheduling. The problem studied was of the scheduling of projects that share the same pool of resources. This situation is very common in some environments of project, i. e., construction P&D units. Fluctuation in resource usage can result in many problems, such as the need in...

متن کامل

An Improved Genetic Algorithm for Resource Constrained Project Scheduling Problem

Project scheduling with limited resources is a challenging management problem that is of immense importance to both practitioners and researchers. This problem is known to be NP-hard even under the simplifying assumptions of single renewable resource constraint, its constant availability over time and minimization of makespan as objective. This paper presents an improved Genetic Algorithm (GA) ...

متن کامل

A Modified Genetic Algorithm for Resource Constrained Project Scheduling

An Evolutionary algorithm for resource constrained project scheduling (RCPS) problem is proposed with the objective to minimize project duration (makespan). The algorithm is tested with standard data sets given by Kolisch library for J30 and J60 and found to be performing well. General Terms Project Scheduling, Resources.

متن کامل

A Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes

Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...

متن کامل

An Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm

In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Access

سال: 2021

ISSN: ['2169-3536']

DOI: https://doi.org/10.1109/access.2021.3062790