Quay Wall By Underwater Strutted Steel Structure System In Kushiro Port

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Autonomous Underwater Vehicles for Port Protection

NATO’s present capability to deal with a terrorist threat to our ports is slow, dangerous, and inefficient. Ports are a challenging area within which to conduct MCM operations due to several factors: shipping movements, very shallow water, turbidity, confined space, mine burial due to muddy/silty conditions, and high clutter density. The shortfall in NATO’s ability to deal with this problem has...

متن کامل

Stability Evaluation of a Quay Wall of Large Cylinders

The stability of the quay wall incorporating large diameter cylinders is of great concern at the Yangshan Port, China, owing to severe marine environment. In this study, finite element analysis is carried out to evaluate the stability of a trial quay wall during construction. The single cylinder is examined in terms of turnover failure subjected to a five year design wave action. The case when ...

متن کامل

Experimental Investigation on Cold-formed Steel Wall Plate System

A series of tests on cold-formed steel (CFS) wall plate system subjected to uplift force at the mid span of the wall plate is presented. The aim of the study was to study the behaviour and identify the modes of failure of CFS wall plate system. Two parameters were considered in these studies: 1) different dimension of U-bracket at the supports and 2) different sizes of lipped Cchannel. The lipp...

متن کامل

Barge rotation planning and quay scheduling in the port of Rotterdam

We consider the problem how to align barge rotations with quay schedules of terminals in the port of Rotterdam. Every time a barge visits the port, it has to make a rotation along, on average, eight terminals to load and unload containers. A central solution, e.g., a trusted party that coordinates the activities of all barges and terminals, is not feasible for several reasons. One of the reason...

متن کامل

Quay crane scheduling with non-interference constraints in port container terminals

The quay crane scheduling problem studied in this paper is to determine a handling sequence of holds for quay cranes assigned to a container vessel considering interference between quay cranes. This paper provides a mixed integer programming model for the considered quay crane scheduling problem that is NP-complete in nature. A genetic algorithm is proposed to obtain near optimal solutions. Com...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: PROCEEDINGS OF CIVIL ENGINEERING IN THE OCEAN

سال: 1992

ISSN: 0912-7348,1884-8265

DOI: 10.2208/prooe.8.355