Queueing Theory-based Path Delay Analysis of Wireless Sensor Networks

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Delay Analysis of Wireless Sensor Networks using Queuing Theory

Ubiquitous wireless sensor network are expected to play an important role in the future society for various applications. As a result, carefully managing the network resources to improve the network performance becomes a hot research topic. The common challenges of a WSN are network connectivity, node mobility, energy consumption, data computation and aggregation at sensor nodes. In this paper ...

متن کامل

Target Tracking Based on Virtual Grid in Wireless Sensor Networks

One of the most important and typical application of wireless sensor networks (WSNs) is target tracking. Although target tracking, can provide benefits for large-scale WSNs and organize them into clusters but tracking a moving target in cluster-based WSNs suffers a boundary problem. The main goal of this paper was to introduce an efficient and novel mobility management protocol namely Target Tr...

متن کامل

An Adaptive LEACH-based Clustering Algorithm for Wireless Sensor Networks

LEACH is the most popular clastering algorithm in Wireless Sensor Networks (WSNs). However, it has two main drawbacks, including random selection of cluster heads, and direct communication of cluster heads with the sink. This paper aims to introduce a new centralized cluster-based routing protocol named LEACH-AEC (LEACH with Adaptive Energy Consumption), which guarantees to generate balanced cl...

متن کامل

Hypercube Bivariate-Based Key Management for Wireless Sensor Networks

Wireless sensor networks are composed of very small devices, called sensor nodes,for numerous applications in the environment. In adversarial environments, the securitybecomes a crucial issue in wireless sensor networks (WSNs). There are various securityservices in WSNs such as key management, authentication, and pairwise keyestablishment. Due to some limitations on sensor nodes, the previous k...

متن کامل

3D Path Planning Algorithm for Mobile Anchor-Assisted Positioning in Wireless Sensor Networks

Positioning service is one of Wireless Sensor Networks’ (WSNs) fundamental services. The accurate position of the sensor nodes plays a vital role in many applications of WSNs. In this paper, a 3D positioning algorithm is being proposed, using mobile anchor node to assist sensor nodes in order to estimate their positions in a 3D geospatial environment. However, mobile anchor node’s 3D path optim...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Advances in Electrical and Computer Engineering

سال: 2011

ISSN: 1582-7445,1844-7600

DOI: 10.4316/aece.2011.02001