Queuing network models for delay analysis of multihop wireless ad hoc networks
                    
                        
                            نویسندگان
                            
                            
                        
                        
                    
                    
                    چکیده
منابع مشابه
SRN Models for Analysis of Multihop Wireless Ad Hoc Networks
Mobile Ad hoc Networks (MANETs) are becoming very attractive and useful in many kinds of communication and networking applications. Due to the advantage of quick construction and numerical analysis of analytical modelling techniques, such as Stochastic Petri nets, Queueing Networks and Process Algebra, have been broadly used for performance analysis of computer networks. In addition, analytical...
متن کاملMultihop Wireless Ad Hoc Networks
An ad hoc network is a collection of mobile nodes using wireless network interfaces to communicate among themselves, discovering and routing along possibly multihop routes to each other without the assistance of fixed infrastructure. In this paper, we describe the design and demonstration of a set of simple routing protocol mechanisms that substantially improve the transmission of real-time mul...
متن کاملA Hidden Node Aware Network Allocation Vector Management System for Multi-hop Wireless Ad hoc Networks
Many performance evaluations for IEEE 802.11distributed coordination function (DCF) have been previouslyreported in the literature. Some of them have clearly indicatedthat 802.11 MAC protocol has poor performance in multi-hopwireless ad hoc networks due to exposed and hidden nodeproblems. Although RTS/CTS transmission scheme mitigatesthese phenomena, it has not been successful in thoroughlyomit...
متن کاملMultihop connectivity in wireless ad hoc networks
Wireless ad hoc networks have numerous real life applications as they can be instantaneously established, require no infrastructure, and are autonomic and selforganizing. Multihop connectivity is the ability of the multiple-hops-away nodes—nodes which are not directly connected—to communicate with each other. Since wireless ad hoc networks are infrastructure-less, the participating nodes themse...
متن کاملDistributed Topology Control for Wireless Multihop Ad-hoc Networks
Abstract— The topology of wireless multihop ad hoc networks can be controlled by varying the transmission power of each node. We propose a simple distributed algorithm where each node makes local decisions about its transmission power and these local decisions collectively guarantee global connectivity. Specifically, based on the directional information, a node grows it transmission power until...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Ad Hoc Networks
سال: 2009
ISSN: 1570-8705
DOI: 10.1016/j.adhoc.2007.12.001