Rail-induced Traffic in China
نویسندگان
چکیده
منابع مشابه
On Time with Rail-Traffic Optimization Technology
Problems with Existing Optimization Approaches Traditional optimization software employs a linear decisionmaking process whereby a single solution is reached. Traditional optimization techniques generally seek a single solution, such as maximizing profit or reducing cost. Each change in the environment (e.g., train delays or equipment fault) triggers the optimization system to start again from ...
متن کاملCharacterisation of airborne particles from rail traffic
Since the investigation of wear particles in rail transport started in late-1910s, the high mass concentration of these particles has raised worries among researchers concerned with air quality. However, effective action has yet to be taken because of lack of relevant knowledge. This thesis provides applicable information for the airborne wear particles in rail transport. Some aspects of their ...
متن کاملpolitical economy of china in central asia
this research is about the political economy of china in central asia. in this research the political & economic interactions affected on chinas political economy in central asia are examined. chinas goal of presence in central asia including political-security, economic and energy goals is described in one part. in another part, the trade relations between china and central asian countries ar...
15 صفحه اولRegional Economic Impact Analysis of High Speed Rail in China
Standard Disclaimer. This volume is a product of the staff of the International Bank for Reconstruction and Development/ The World Bank. The findings, interpretations, and conclusions expressed in this paper do not necessarily reflect the views of the Executive Directors of The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in t...
متن کاملLife cycle assessment of High Speed Rail in China
China has built the world’s largest High Speed Rail (HSR) network. Its environmental impacts have been examined by the means of life cycle assessment (LCA) which describes the whole picture of the HSR system instead of single stages, with a case study for the highspeed railway that links Beijing and Shanghai. The research employs the China-specific life cycle inventory database Chinese Core Lif...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: PROMET - Traffic&Transportation
سال: 2017
ISSN: 1848-4069,0353-5320
DOI: 10.7307/ptt.v29i5.2235