Railway maintenance reservation scheduling considering detouring delays and maintenance demand

نویسندگان

چکیده

Railway maintenance works are performed to reduce the probability of occurrence a failure on components railway infrastructure. The scheduling work is important in supporting normal daily operation railway. By proper scheduling, operational hindrance terms extra travel costs due detouring can be minimized. In addition, contractors given more space execute activities with flexibility. This study aims optimize schedules for both train operators and by considering flexibility stakeholders, respectively. tries achieve this modeling factors contributing objectives relevant constraints multi-objective optimization problem. methods presented solving model ɛ-constraint method NSGA-II. Two path finding algorithms modified consider limitations used support solutions methods. Both solution strategies initially tested fictive networks analyze performance. case study, Dutch network assessed create new based model.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling of Flexible Manufacturing Systems Considering Maintenance

Scheduling of flexible manufacturing systems is one of problems in NP-Hard optimization. The aim of scheduling of these systems is to maximize the system efficiency by finding an optimal planning for a better cooperation among various processes. In recent years many algorithms proposed to solve this problem, and most of them are based on heuristic methods. In This paper we have proposed a new a...

متن کامل

Punctuality and Railway Maintenance

The iron ore railway in northern Scandinavia is a single track line that stretches from the Gulf of Bothnia to the Norwegian Sea. Mixed traffic on a single-track railway makes the traffic sensitive and prone to disturbances. To improve punctuality and efficiency in the traffic flow, the link between disturbances and their impacts on train delays needs to be analysed and understood more precisel...

متن کامل

Genetic and memetic algorithms for scheduling railway maintenance activities

Nowadays railway companies are confronted with high infrastructure maintenance costs. Therefore good strategies are needed to carry out these maintenance activities in a most cost effective way. In this paper we solve the preventive maintenance scheduling problem (PMSP) using genetic algorithms, memetic algorithms and a two-phase heuristic based on opportunities. The aim of the PMSP is to sched...

متن کامل

A heuristic approach to railway track maintenance scheduling

Travelling safely and comfortably on high speed railway lines requires excellent conditions of the whole railway infrastructure in general and of the railway track geometry in particular. The maintenance process required to achieve such excellent conditions is largely complex and expensive, demanding an increased amount of both human and technical resources. In this framework, an optimal schedu...

متن کامل

Long Term Cost Effective Preventive Maintenance Scheduling

Preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. It consists of knowing which generating units should be shut down for regular safety inspection. In this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (CRI) is pr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Rail Transport Planning & Management

سال: 2023

ISSN: ['2210-9714', '2210-9706']

DOI: https://doi.org/10.1016/j.jrtpm.2022.100359