RAINFALL-RUNOFF SIMULATION BY USING DISTRIBUTED INSTANTANEOUS UNIT HYDROGRAPH DERIVED FROM APPLYING FLOW ACCUMULATION VALUE OF DEM

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Runoff simulation using geomorphological instantaneous unit hydrograph (GIUH). (case study: Bar basin-Khorasan Razavi)

Considering the most of country have no gage station, in recent year one method can be proposed with the involvement of other information, which will affect hydrology condition. It can estimate flood water level. In this study, considering relationship between geomorphology and hydrology, using little information, flood hydrograph were simulated. This method is named geomorphological instantane...

متن کامل

Flood Hydrograph Simulation with Uncertainty in Rainfall - Runoff Parameters

Flood hydrograph simulation is affected by uncertainty in Rainfall – Runoff )RR( parameters. Uncertainty of RR parameters in Gharasoo catchment, part of the great Karkheh river basin, is evaluated by Monte–Carlo (MC) approach. A conceptual-distributed model, called ModClark, was used for basin simulation, in which the basin’s hydrograph was determined using the superposition of runoff generated...

متن کامل

Flood Hydrograph Simulation with Uncertainty in Rainfall - Runoff Parameters

Flood hydrograph simulation is affected by uncertainty in Rainfall – Runoff )RR( parameters. Uncertainty of RR parameters in Gharasoo catchment, part of the great Karkheh river basin, is evaluated by Monte–Carlo (MC) approach. A conceptual-distributed model, called ModClark, was used for basin simulation, in which the basin’s hydrograph was determined using the superposition of runoff generated...

متن کامل

Simulation of Rainfall - Runoff Events by Applying Phase Differences Diagrams and Correcting Effective Rainfall Components

   The conversion of rainfall to runoff in basins includes nonlinear relations between the complex interactions of various hydrological processes. In this study, without considering of predetermined structure, relationship between input and output system was derived individually from the nature of the data recorded. Also, the phase difference occurred between rainfall and runoff signals using c...

متن کامل

Geomorphologic Instantaneous Unit Hydrograph Stream Flow Simulation for the Yalobusha River Basin, MS

In erosion and sedimentation problems, estimating the range of significant stream flows to include when computing sediment transport can prove challenging in ungauged or under-gauged basins. This paper describes an event-based model incorporating a geomorphologic instantaneous unit hydrograph and stochastic descriptions of peak flows and frequency of storm events from nearby reference watershed...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: PROCEEDINGS OF HYDRAULIC ENGINEERING

سال: 2004

ISSN: 0916-7374,1884-9172

DOI: 10.2208/prohe.48.1