Rationalizing Critical Cost Overrun Factors on Public Sector Housing Programmes

نویسندگان

چکیده

The cost overrun phenomenon on projects worldwide creates a major source of risk that warrants investigation. prevailing factor school thought provides strong empirical evidence critical factors contributing to overruns are both context-specific and project-specific. Although many studies have been conducted identifying causes overruns, very few investigated root causes. Additionally, limited body knowledge is available within the context Small Island Development States (SIDS). To fill this gap, objectives study were identify determine main in public sector social housing programmes (PSSHPs). These selected thereafter categorized under leading causes, their severity was determined based primary stakeholders’ perspectives. One hundred twenty-three identified from literature, which forty-one extracted grouped four pilot survey relevant experts Trinidadian Jamaican construction sectors. refined formulated into questionnaire survey. five responses obtained professionals who had minimum years’ experience various phases delivery. these evaluated, ranked, using relative importance index (RII) approach. findings uncovered cause, political nature. top selection politically aligned contractors, intentional design inadequate contracts, project actors' deliberately underestimating costs, partisan management team, strategic misrepresentation. unique SIDS contribute reframe contemporary practices, focus mainly technical Finally, as existing solutions ineffective curbing PSSHPs, also inform policymakers prioritization, control, mitigation risks formulating effective governance mechanisms. Doi: 10.28991/ESJ-2022-06-03-016 Full Text: PDF

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

the impact of e-readiness on ec success in public sector in iran the impact of e-readiness on ec success in public sector in iran

acknowledge the importance of e-commerce to their countries and to survival of their businesses and in creating and encouraging an atmosphere for the wide adoption and success of e-commerce in the long term. the investment for implementing e-commerce in the public sector is one of the areas which is focused in government‘s action plan for cross-disciplinary it development and e-readiness in go...

Public-sector Maternal Health Programmes and Services for Rural Bangladesh

Achieving Millennium Development Goal 5 in Bangladesh calls for an appreciation of the evolution of maternal healthcare within the national health system to date plus a projection of future needs. This paper assesses the development of maternal health services and policies by reviewing policy and strategy documents since the independence in 1971, with primary focus on rural areas where three-fo...

متن کامل

ERP Critical Success Factors: An Exploration of the Contextual Factors in Public Sector Institutions

New information technologies have brought public sector higher education institutions (HEIs) into increased competition, while their government funding in parallel has been continually eroded. In response to these growing pressures, there has been a call for HEIs to improve operational efficiency and to reduce duplication of resources by implementing advanced information systems that span the i...

متن کامل

Using Structural Equation Modelling to Assess Effects of Construction Resource Related Factors on Cost Overrun

Cost performance is the basic criteria for measuring success of any project. Since construction projects are highly dependable on resources, construction cost is significantly affected by various resource related factors. Compared to traditional methods of data analysis, Structural Equation Model (SEM) is the graphical equivalent of a mathematical representation to study relationship between de...

متن کامل

Factors Causing Project Cost Overrun in the Telecommunications Industry in Oman

Several studies have been carried out to investigate the causes of project cost overrun in different industries worldwide. This paper reports on the results of a study investigating the factors causing project cost overrun in Oman. Data required for this study were collected from 44 project engineers and managers of client and contracting companies involved in telecommunications projects. Accor...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Emerging science journal

سال: 2022

ISSN: ['2610-9182']

DOI: https://doi.org/10.28991/esj-2022-06-03-016