Re-Evaluating Megaproject Cost Overruns: Putting Changes Into Perspective

نویسندگان

چکیده

The vast sums of money involved in megaprojects, and the perceived lack public benefit, create controversy. Flyvberg’ s iron law asserts that megaprojects are over budget, time, under benefits, again (Flyvberg, 2018). More recent research suggests this focus on cost overruns is based highly misleading data (Love & Ahiaga-Dagbui, 2017). This seeks to examine live Flyvbjergs theories practice, through an investigation current Middle East. provides three case studies for two recently completed one on-going megaproject, these claims further. questions whether right comparisons made between initial offerings final product, consultation with professionals. Based findings, it suggested increase 100% Contract price, may not constitute over-budget megaproject. Professional Cost Consultants built environment can provide greater insight into complexity adds transitions from costs although validity be reduced by a distance or overview paper investigates some familiar sources megaproject overrun considers findings engaged monitoring state Qatar. Time considerations just characteristics evident megaprojects. reporting time frequently limited, misunderstood misreported data, order higher fidelity, such ‘headline claims’ need careful considered context original project scope. recognises element warrant more holistic including acknowledgement other significant as their embodiment large components risk, political influences, organisational pressures management complexities.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Putting ALLHAT into Perspective

Antihypertensive and Lipid-Lowering Treatment to Prevent Heart Attack Trial (the ALLHAT study), reported in late 2002,1 drew the interest of media journalists as well as the attention of the medical community and the health care industry. The nation’s leading newspapers and television networks scrambled to provide coverage of the significant findings. Although the abbreviated versions that made...

متن کامل

Putting co-sleeping into perspective.

Co-sleepingbegins in infancy andoften continues through to childhood as part of early nurturing practices. In evolutionary terms the human infant is the most neurologically immature primate at birth and develops the most slowly, thus intense and prolonged mother-infant contact acts as a protectivemechanismagainst physiological difficulties and environmental assaults. Proposed benefits of close ...

متن کامل

Equilibrium Cost Overruns

Cost overruns are endemic in military procurement projects and pervasive in other areas. This paper studies a model in which the apparent cost overruns arise not as systematic expectational errors but as equilibrium phenomena. The possibility of renegotiating payments when cost overruns occur results in firms bidding below their true estimate of expected project costs. This can cause the initia...

متن کامل

Putting orang-utan population trends into perspective

Is it true that “the orang-utan could be virtually extinct within five years”, as reported by [1] in a recent issue of Current Biology? The dire conservation status of this ape warrants a sense of urgency [2], but we would like to present a more balanced view and highlight the emergence of some positive trends. Illegal logging, forest conversion and associated fires occur in most Indonesian nat...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International journal of innovation and economic development

سال: 2021

ISSN: ['1849-7020', '1849-7551']

DOI: https://doi.org/10.18775/ijied.1849-7551-7020.2015.66.2002