Reactive scheduling in a dynamic and stochastic FMS environment
نویسندگان
چکیده
منابع مشابه
Performance Analysis of Dynamic and Static Facility Layouts in a Stochastic Environment
In this paper, to cope with the stochastic dynamic (or multi-period) problem, two new quadratic assignment-based mathematical models corresponding to the dynamic and static approaches are developed. The product demands are presumed to be dependent uncertain variables with normal distribution having known expectation, variance, and covariance that change from one period to the next one, randomly...
متن کاملUsing multi-agent architecture in FMS for dynamic scheduling
The proposed scheduling strategy is based on a multi-agent architecture. Each agent of this architecture is dedicated to a work centre (i.e. a set of resources of the manufacturing system); it selects locally and dynamically the most suitable dispatching rules. Depending on local and global considerations, a new selection is carried out each time a prede®ned event occurs (for example, a machine...
متن کاملGeneration scheduling in a competitive environment
Electric power restructuring offers a major change to the vertically integrated monopoly. The change manifests the main part of engineers’ efforts to reshape the three components of today’s vertically integrated monopoly: generation, distribution and transmission. In a restructured environment, the main tasks of these three components will remain the same as before, however, to comply with ...
متن کاملPlanning and Scheduling in an Fms*
The Dutch institute of applied physics of TN0 and the Institute of Metals TN0 (Apeldoorn) have installed a flexible manufacturing system (FMS). The main components of this FA4S are a turret lathe, a machining centre and a transport system. One of the objectives of this system is to produce a wide variety of parts in small batches. Several interesting (short term) planning and scheduling problem...
متن کاملA stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Production Research
سال: 2003
ISSN: 0020-7543,1366-588X
DOI: 10.1080/0020754031000149202