Reducing Construction Dust Pollution by Planning Construction Site Layout
نویسندگان
چکیده
Many construction activities generate fine particles and severely threaten the physical health of workers. Although many dust control measures are implemented in industry, occupational risks still exist. In order to improve level, this study proposes a new method reducing pollution through reasonable site layout plan. This is based on field measurement diffusion law. The law can be fitted monitoring data. With law, average concentration exposed workers different layouts simulated. addition, cost concern for managers. Therefore, total transportation reduction another optimization objective. Finally, multi-objective particle swarm (MOPSO) algorithm used search an optimized that reduce simultaneously. result shows significantly reduced by 60.62% 44.3%, respectively. paper quantifies provides managers with practical solution at low cost.
منابع مشابه
Simulation Applications in Construction Site Layout Planning
In the planning phase of every construction project, layout of temporary facilities is a crucial task; site layout can affect safety, travel cost and time, construction productivity, and space utilization. However, site layout planning can be a complicated problem, due to the interdependency of influencing factors. Although interaction among activities is one of the major drivers of site layout...
متن کاملStudy on Noise Pollution at Construction Site
Construction sites grinds out deep noises, mostly from vehicles, equipment and array of machineries. Surplus noise is not only infuriating and diversionary, but can lead to hard of hearing, blood pressure, sleeping trouble and awful stress. High noise levels in construction escalate the nature and environment. Among various pollutions noise pollution from construction industry is one of the imp...
متن کاملConsideration between Site Layout Facilities, Provision of Work Equipments and Construction Planning for Extremely Large and Complicated Construction Projects
The effectiveness in site layout and construction planning for extremely large-scale and complicated construction projects not only affects productivity and cost, it also controls whether a project can be handled and completed in a practical, safe, orderly, efficient and engineering feasible manner. Projects qualified to be extremely large and complicated can be in a variety of forms. Take for ...
متن کاملA BIM-based automated site layout planning framework for congested construction sites
a r t i c l e i n f o Keywords: Actual travel paths Building information modelling (BIM) Construction site layout planning (CSLP) Congested sites Facility dimensions optimization Interior storage Site layout planning is often performed on construction sites to find the best arrangement of temporary facilities so that transportation distances of on-site personnel and equipment are minimized. It ...
متن کاملGeneric Process Mapping and Simulation Methodology for Integrating Site Layout and Operations Planning in Construction
The present research is intended to address dynamic construction-process simulation methods, with a focus on how to effectively model resource transit among various activity locations in the site system. Following a review of basic simulation paradigms and recent research developments, we propose a new process mapping and simulation methodology for modeling construction operations. The simulati...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Buildings
سال: 2022
ISSN: ['2075-5309']
DOI: https://doi.org/10.3390/buildings12050531