Rejecting jobs to minimize load and maximum flow-time

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Rejecting jobs to Minimize Load and Maximum Flow-time

Online algorithms are usually analyzed using the notion of competitive ratio which compares the solution obtained by the algorithm to that obtained by an online adversary for the worst possible input sequence. Often this measure turns out to be too pessimistic, and one popular approach especially for scheduling problems has been that of “resource augmentation” which was first proposed by Kalyan...

متن کامل

Scheduling Parallel DAG Jobs Online to Minimize Average Flow Time

In this work, we study the problem of scheduling parallelizable jobs online with an objective of minimizing average flow time. Each parallel job is modeled as a DAG where each node is a sequential task and each edge represents dependence between tasks. Previous work has focused on a model of parallelizability known as the arbitrary speed-up curves setting where a scalable algorithm is known. Ho...

متن کامل

Preemptive Multi-Machine Scheduling of Equal-Length Jobs to Minimize the Average Flow Time

We study the problem of preemptive scheduling of n equal-length jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. Recently, Brucker and Kravchenko [1] proved that the optimal schedule can be computed in polynomial time by solving a linear program with O(n) variables and constraints, followed by some substantial post-processing (w...

متن کامل

FLOW SHOP SCHEDULING ALGORITHM TO MINIMIZE COMPLETION TIME FOR -JOBS -MACHINES PROBLEM n m

In a shop floor of the industry, the routings which are based upon the jobs that need to be processed on different machines are one among the major activities and therefore the resource requirements are not based upon the quantity as in a flow shop but rather the routings for the products being produced. However, both job shop and flow shop production cope with a scheduling problem to find a fe...

متن کامل

Scheduling parallel jobs to minimize the makespan

We consider the NP-hard problem of scheduling parallel jobs with release dates on identical parallel machines to minimize the makespan. A parallel job requires simultaneously a prespecified, job-dependent number of machines when being processed. We prove that the makespan of any nonpreemptive list-schedule is within a factor of 2 of the optimal preemptive makespan. This gives the best-known app...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Computer and System Sciences

سال: 2018

ISSN: 0022-0000

DOI: 10.1016/j.jcss.2017.07.006