Reliability oriented multi-AGVs online scheduling and path planning problem of automated sorting warehouse system

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Research on the Collision-Free Path Planning of Multi-AGVs System Based on Improved A* Algorithm

Path planning problem is the core and hot research topic of multiple Automatic Guided Vehicles (multi-AGVs) system. Although there are many research results, they do not solve the path planning problem from the perspective of reducing traffic congestion. A collision-free path planning method based on improved A* Algorithm for multi-AGVs logistics sorting system is proposed in this paper. In the...

متن کامل

A Job Shop Scheduling and Location of Battery Charging Storage for the Automated Guided Vehicles (AGVs)

When the Automated Guided Vehicles (AGVs) are transferring the parts from one machine to another in a job shop environment, it is possible that AGVsstopon their guidepaths since their batteries are discharged.Consequently, it is essential to establish at least one Battery Charging Storage (BCS) to replace full batteries with empty batteries for the stopped AGVs. Due to non-predictable routes fo...

متن کامل

Scheduling Single-Load and Multi-Load AGVs in Container Terminals

In this paper, three solutions for scheduling problem of the Single-Load and Multi-Load Automated Guided Vehicles (AGVs) in Container Terminals are proposed. The problem is formulated as Constraint Satisfaction and Optimization. When capacity of the vehicles is one container, the problem is a minimum cost flow model. This model is solved by the highest performance Algorithm, i.e. Network Simple...

متن کامل

Scheduling of AGVs in a Mesh-like Path Topology

Based on the routing algorithm presented in our previous papers [3,4], we propose two scheduling strategies in this report to schedule a large number of AGVs concurrently in a mesh-like path topology. One strategy is pipelined scheduling, the other one is serial scheduling. By comparing both methods, we obtain certain conditions for ensuring a high system throughput.

متن کامل

Multi-Objective Scheduling Problem in a Three-Stage Production System

A three stage production system is considered in this paper. There are two stages to fabricate and ready the parts and an assembly stage to assembly the parts and complete the products in this system. Suppose that a number of products of different kinds are ordered. Each product is assembled with a set of several parts. At first the parts are produced in the first stage with parallel machines a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP Conference Series: Materials Science and Engineering

سال: 2021

ISSN: 1757-8981,1757-899X

DOI: 10.1088/1757-899x/1043/2/022035