Research of Security Constrained Dispatching for Monthly Generation Plan
نویسندگان
چکیده
منابع مشابه
Static Security Constrained Generation Scheduling Using Sensitivity Characteristics of Neural Network
This paper proposes a novel approach for generation scheduling using sensitivitycharacteristic of a Security Analyzer Neural Network (SANN) for improving static securityof power system. In this paper, the potential overloading at the post contingency steadystateassociated with each line outage is proposed as a security index which is used forevaluation and enhancement of system static security....
متن کاملA Constrained Growth Method for Procedural Floor Plan Generation
Modern games often feature highly detailed urban environments. However, buildings are typically represented only by their façade, because of the excessive costs it would entail to manually model all interiors. Although automated procedural techniques for building interiors exist, their application is to date limited. One of the reasons for this is because designers have too little control over ...
متن کاملsolution of security constrained unit commitment problem by a new multi-objective optimization method
چکیده-پخش بار بهینه به عنوان یکی از ابزار زیر بنایی برای تحلیل سیستم های قدرت پیچیده ،برای مدت طولانی مورد بررسی قرار گرفته است.پخش بار بهینه توابع هدف یک سیستم قدرت از جمله تابع هزینه سوخت ،آلودگی ،تلفات را بهینه می کند،و هم زمان قیود سیستم قدرت را نیز برآورده می کند.در کلی ترین حالتopf یک مساله بهینه سازی غیر خطی ،غیر محدب،مقیاس بزرگ،و ایستا می باشد که می تواند شامل متغیرهای کنترلی پیوسته و گ...
Incorporating Wind Power Generation And Demand Response into Security-Constrained Unit Commitment
Wind generation with an uncertain nature poses many challenges in grid integration and secure operation of power system. One of these operation problems is the unit commitment. Demand Response (DR) can be defined as the changes in electric usage by end-use customers from their normal consumption patterns in response to the changes in the price of electricity over time. Further, DR can be also d...
متن کاملPlan Reuse versus Plan Generation :
The ability of a planner to reuse parts of old plans is hypothesized to be a valuable tool for improving eeciency of planning by avoiding the repetition of the same planning eeort. We test this hypothesis from an analytical and empirical point of view. A comparative worst-case complexity analysis of generation and reuse under diierent assumptions reveals that it is not possible to achieve a pro...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Energy and Power Engineering
سال: 2013
ISSN: 1949-243X,1947-3818
DOI: 10.4236/epe.2013.54b118