Research on construction schedule risk management of power supply and distribution projects based on MCS-AHP model
نویسندگان
چکیده
In order to manage the construction schedule risk of power supply and distribution engineering, a evaluation model, namely Monte Carlo simulation method - Analytic Hierarchy Process (MCS-AHP) is proposed. this adopted improve analytic (AHP), normal interval used replace specific value when constructing fuzzy complementary judgment matrix, reduce thinking incomplete information or scattered data in process investigation scientific evaluation. This paper takes project Guangdong Province as an example uses MCS-AHP model measure key factors limiting progress, AHP for comparative analysis, verify feasibility model. The analysis shows that influencing are material equipment procurement, production arrival, installation 10 kv high voltage switchboard, electrical acceptance single machine commissioning, low-voltage switchboard DC foundation station equipment, etc., which consistent with actual situation. Therefore, it feasible construct can provide new way management analysis.
منابع مشابه
application of upfc based on svpwm for power quality improvement
در سالهای اخیر،اختلالات کیفیت توان مهمترین موضوع می باشد که محققان زیادی را برای پیدا کردن راه حلی برای حل آن علاقه مند ساخته است.امروزه کیفیت توان در سیستم قدرت برای مراکز صنعتی،تجاری وکاربردهای بیمارستانی مسئله مهمی می باشد.مشکل ولتاژمثل شرایط افت ولتاژواضافه جریان ناشی از اتصال کوتاه مدار یا وقوع خطا در سیستم بیشتر مورد توجه می باشد. برای مطالعه افت ولتاژ واضافه جریان،محققان زیادی کار کرده ...
15 صفحه اولResearch on Investment Risk Management of Chinese Prefabricated Construction Projects Based on a System Dynamics Model
Prefabricated construction, a new direction for the future development of the Chinese construction industry, can maximize the requirements of “green”. As a new form of green building, prefabricated construction is of particular interest. On account of the immature development of the green building market in China, the investment risk for prefabricated construction is higher than for traditional...
متن کاملmortality forecasting based on lee-carter model
over the past decades a number of approaches have been applied for forecasting mortality. in 1992, a new method for long-run forecast of the level and age pattern of mortality was published by lee and carter. this method was welcomed by many authors so it was extended through a wider class of generalized, parametric and nonlinear model. this model represents one of the most influential recent d...
15 صفحه اولDeveloping a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System
Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...
متن کاملMethodology based on MCDM for risk management in EPC projects: A Case Study of LPG Storage Tanks Construction
The most important aim of every project is on time completion, budget consideration and reaching the highest possible quality, based on contract. This paper suggests a methodology for risk management in engineering, procurement, and construction (EPC) projects. Risk management enables project teams to perform with minimum deviation from predetermined goals. The proposed methodology identifies a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Frontiers in Energy Research
سال: 2023
ISSN: ['2296-598X']
DOI: https://doi.org/10.3389/fenrg.2022.1104007