Research on Online Car-Hailing Scheduling Problem Based on Resource Allocation

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Research on Project Scheduling Problem with Resource Constraints

Resource-constrained project scheduling problem is the traditional optimization problem considering constraint conditions of resource supply, which makes the problem more difficult to solve in real life. Resourceconstrained project scheduling problem is a typical NP-hard problem, which is quite popular issue in recent years. This article firstly analyzes the literature review of resourceconstra...

متن کامل

Research on Resource Allocation based on Clustering in Femtocell Networks

Aiming at the problem that existing femtocell base station searching the optimal clustering scheme based on the clustering resource allocation algorithm is complex. We propose that building an conflict graph and adjacency matrix before clustering to calculate the number of clusters needed for FBS group by using the adaptive clustering heuristic algorithm. We follow maximization the sum of the F...

متن کامل

A Survey on Scheduling Based Resource Allocation in Cloud Computing

Cloud computing is the next generation of technology which unifies everything into one. It is an on demand service because it offers dynamic flexible resource allocation for reliable and guaranteed services in pay as-you-use manner to public. In Cloud computing multiple cloud users can request number of cloud services simultaneously. So there must be a provision that all resources are made avai...

متن کامل

Resource Allocation in Construction Scheduling based on Multi- Agent Negotiation

Computerized project management in construction is traditionally based on precedence diagrams such as PERT or CPM. Resources required for the execution of activities are usually scarce and therefore provide additional constraints to the predecessor-successor relationships. The objective of this NPhard problem, which is also known as Resource Constrained Project Scheduling Problem (RCPSP), is to...

متن کامل

Integrated modeling and solving the resource allocation problem and task scheduling in the cloud computing environment

Cloud computing is considered to be a new service provider technology for users and businesses. However, the cloud environment is facing a number of challenges. Resource allocation in a way that is optimum for users and cloud providers is difficult because of lack of data sharing between them. On the other hand, job scheduling is a basic issue and at the same time a big challenge in reaching hi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Business and Management

سال: 2020

ISSN: 1833-8119,1833-3850

DOI: 10.5539/ijbm.v15n5p147