Research on Optimization for Units Start During Power System Restoration

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Subsystem Partitioning for Power System Black-start Considering Restoration Reliability

Original scientific paper After large scale blackout, there may be more than one black-start unit in power system. A rational subsystem partitioning restoration scheme could speed up the entire system restoration procedure and promote restoration reliability. In the paper, a subsystem partitioning strategy considering the restoration reliability is proposed. The calculation of nodes restoration...

متن کامل

Power System Restoration using Particle Swarm Optimization

This paper presents an efficient and reliable Particle Swarm Optimization (PSO) algorithm for solving Power System Restoration (PSR). The main objective is that after an incident due to electrical failure, power system restoration becomes a complex process involving decision-making problems of combinatory nature that can be formulated as a multi-stage, nonlinear, continuous and binary constrain...

متن کامل

application of upfc based on svpwm for power quality improvement

در سالهای اخیر،اختلالات کیفیت توان مهمترین موضوع می باشد که محققان زیادی را برای پیدا کردن راه حلی برای حل آن علاقه مند ساخته است.امروزه کیفیت توان در سیستم قدرت برای مراکز صنعتی،تجاری وکاربردهای بیمارستانی مسئله مهمی می باشد.مشکل ولتاژمثل شرایط افت ولتاژواضافه جریان ناشی از اتصال کوتاه مدار یا وقوع خطا در سیستم بیشتر مورد توجه می باشد. برای مطالعه افت ولتاژ واضافه جریان،محققان زیادی کار کرده ...

15 صفحه اول

An Expert System for Power System Restoration

This paper introduces a power system restoration guidance system that assists the decision of power system operators for reliable and fast restoration processes when a blackout happens in a power system. This system consists of three major subsystems, that is a topology processor, main restoration guidance expert system and another expert system for voltage control. The topology processor ident...

متن کامل

Strategic Planning for Power System Restoration

This paper considers the power system restoration planning problem (PSRPP) for disaster recovery, a fundamental problem faced by all populated areas. PSRPPs are complex stochastic optimization problems that combine resource allocation, warehouse location, and vehicle routing considerations. Furthermore, electrical power systems are complex systems whose behavior can only be determined by physic...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Energy and Power Engineering

سال: 2013

ISSN: 1949-243X,1947-3818

DOI: 10.4236/epe.2013.54b137