Resource Constrained Chain Scheduling of UET Jobs on Two Machines
نویسندگان
چکیده
منابع مشابه
Resource constrained scheduling on multiple machines
Abstract. This paper is devoted to Resource Constrained Scheduling. An instance for this problem is given by a set of n jobs with lengths and weights and a set of m machines with capacities. At every time each machine can run arbitrary many jobs in parallel but the total weight of these jobs must not exceed the capacity of the machine. Furthermore the m machines work in parallel and we wish to ...
متن کاملOn-line scheduling of parallel jobs on two machines
We study the problem of on-line scheduling of parallel jobs on two machines. The jobs are parallel in the sense that each of them specifies the number of processors, in this case 1 or 2, required for simultaneous processing. The jobs are presented one by one. Upon receiving a job, we must assign the job to a time slot in the schedule before the next job is presented. No re-assignment is allowed...
متن کاملOnline scheduling of two type parallel jobs on identical machines
In this paper we consider an online scheduling of parallel jobs with preemption on identical machines, where jobs arrive over time. The objective is to minimize the makespan. For the problem that jobs have only two possible widths mj = 1 or m, we present an optimal online algorithm by using " temporary schedule " .
متن کاملUet-scheduling with Chain-type Precedence Constraints Uet|scheduling with Chain-type Precedence Constraints
x{ Scope and Purpose. | We consider a scheduling problem in a two-processor system where (i) every job can be processed on only one machine and where (ii) there are chain-type precedence relations among the jobs. The goal is to minimize the makespan. This continues the work of Chang and Lee 1], Jansen 4] and of Kellerer and Woeginger 5]. Abstract. | We consider a special case of the precedence ...
متن کاملScheduling split - jobs on parallel machines
In classical shop scheduling, the tasks corresponding to a job may not be executed in parallel, i.e., their processing times may not overlap. In case these tasks are processes , independent of each other, this assumption is no longer justified. We consider corresponding scheduling problems where each job splits into a number of pairwise independent processes that have to be executed on dedicate...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Operations Research
سال: 1998
ISSN: 0030-364X,1526-5463
DOI: 10.1287/opre.46.5.742