Resource-Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations
نویسندگان
چکیده
منابع مشابه
A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS
In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...
متن کاملSplittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملsplittable stochastic project scheduling with constrained renewable resource
this paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. if the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. it is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. the ...
متن کاملStochastic Resource-constrained Project Scheduling
PREFACE After having received my diploma from the Technische Universität Berlin in 1996, Rolf Möhring, the supervisor of my diploma thesis, offered me a research position in his group. At that time I was employed at a Berlin software company the head of which, Gert Scheschonk, strongly encouraged me to accept the offer. I accepted and in 1997 I began to work within a research initiative funded ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: SSRN Electronic Journal
سال: 2007
ISSN: 1556-5068
DOI: 10.2139/ssrn.1089381