Response time for primary frequency control of hydroelectric generating unit

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Frequency-Bias Tie-Line Control of Hydroelectric Generating Stations for Long Distances

In this work I have tried to apply effective dedicated online control systems to two equal power systems connected by a long distance tie-line. When large interconnected systems are linked electrically to others by means of tie-lines, the power transfers between them are usually decided by mutual agreement and the power is controlled by regulators. Other side it is a desired feature to achieve ...

متن کامل

A virtual reality system for hydroelectric generating unit maintenance training and understanding

This paper presents the conception, the design and a prototype of a virtual reality system for learning and maintenance training of Hydroelectric Generating Unit (HGU). The system adopts a modular architecture that makes it expansive and flexible for other areas of assembly training. The system is subdivided in two main functional modules: educative and maintenance. The first one familiarizes t...

متن کامل

MULTICRITERION SYNTHESIS OF INTELLIGENT CONTROL SYSTEMS OF GENERATING UNIT OF NUCLEAR POWER STATION

The paper is devoted to solution of some problems in nuclear power station generating unit intellectual control systems using genetic algorithms on the basis of control system model development, optimizations methods of their direct quality indices and improved integral quadratic estimates. Some mathematical vector models were obtained for control system multicriterion quality indices with due ...

متن کامل

Challenges of Primary Frequency Control and Benefits of Primary Frequency Response Support from Electric Vehicles

As the integration of wind generation displaces conventional plants, system inertia provided by rotating mass declines, causing concerns over system frequency stability. This paper implements an advanced stochastic scheduling model with inertia-dependent fast frequency response requirements to investigate the challenges on the primary frequency control in the future Great Britain electricity sy...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Electrical Power & Energy Systems

سال: 2016

ISSN: 0142-0615

DOI: 10.1016/j.ijepes.2015.07.003