Rework causes classification model with liable parties of the contract in construction projects

نویسندگان

چکیده

Rework is an interesting topic in the contract management of construction projects. An effective way improving performance on projects to manage rework. However, managing rework challenging because dynamic nature activities. A rational starting point identification root causes then a framework for its can be developed performance. This paper reviews rework-related studies industry through critical review literature investigate main contracts. content analysis previously proposed classification methods revealed that all could grouped under various project stages. The also ascribed different parties. previous have suggested categories rework, there no commonly used model current study proposes three levels address this gap. categorised five constructs linked stages two liable findings show procurement stage has fewer than design and construction. result reveals involvement level parties occurrence investigated documents. Thus, suggests further research conditions.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analyzing the causes of falling from height accidents in construction projects with analytical hierarchy process (AHP)

Introduction: Fall from height is one of the main causes of death in the construction workers. Therefore, this study aimed to identify and prioritize the factors affecting falls from height accidents in construction industry. Material and method: A descriptive-analytical study was conducted on five constructional projects in Pars Jonoobi industrial region, Iran. All of the reported events from...

متن کامل

Classification of Construction Projects

In order to address construction project requirements and specifications, scholars and practitioners need to establish taxonomy according to a scheme that best fits their need. While existing characterization methods are continuously being improved, new ones are devised to cover project properties which have not been previously addressed. One such method, the Project Definition Rating Index (PD...

متن کامل

Analyzing delay causes in Egyptian construction projects

Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through i...

متن کامل

data mining rules and classification methods in insurance: the case of collision insurance

assigning premium to the insurance contract in iran mostly has based on some old rules have been authorized by government, in such a situation predicting premium by analyzing database and it’s characteristics will be definitely such a big mistake. therefore the most beneficial information one can gathered from these data is the amount of loss happens during one contract to predicting insurance ...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Frontiers in Built Environment

سال: 2023

ISSN: ['2297-3362']

DOI: https://doi.org/10.3389/fbuil.2023.1143829