RHIC performance and future plans
نویسندگان
چکیده
منابع مشابه
Rhic Status and Plans”
RHIC ended successfully its second year of operation in January 2002 after a six month run with gold ions and two months of polarized proton collisions. I will review the machine performance and accomplishments, that include reaching design energy (100 GeV/u) and design luminosity during the gold run, and the first high energy (100 GeV) polarized proton collisions. I will also discuss the machi...
متن کاملRHIC Low-Energy Challenges and Plans
T. Satogata∗†, L. Ahrens, M. Bai, J.M. Brennan, D. Bruno, J. Butler, A. Drees, A. Fedotov, W. Fischer, M. Harvey, T. Hayes, W. Jappe, R.C. Lee, W.W. MacKay, N. Malitsky, G. Marr, R. Michnoff, B. Oerter, E. Pozdeyev, T. Roser, F. Severino, K. Smith, S. Tepikian, and N. Tsoupas Brookhaven National Laboratory E-mail: [email protected], [email protected], [email protected], [email protected], [email protected], j...
متن کاملPlans for Spin Physics at Rhic
Polarized proton collisions will be studied at RHIC up to a total center of mass energy of 500 GeV, starting in 2002. An overview of the RHIC-spin program, and the critical components of the PHENIX and STAR detectors for spin experiments, is presented. The premier experiment within the RHIC-spin program is the determination of the fraction of the proton's spin carried by gluons. A detailed anal...
متن کاملFuture Measurements at RHIC
I review the present status of measurements at RHIC and suggest possible upgrades which will be necessary to answer some of the most critical questions in Relativistic Heavy Ion Physics.
متن کاملPerformance of the Cesr Superconducting Rf System and Future Plans*
As we have reported at the last SRF Workshop two years ago, staged transition of the Cornell Electron Storage Ring (CESR) RF System from normal conducting to superconducting was completed in September 1999 with installation of the fourth superconducting B-cell cavity [1]. Since that time the last cavity has been commissioned and RF system has operated stably providing CESR beams with up to 1.13...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms
سال: 2005
ISSN: 0168-583X
DOI: 10.1016/j.nimb.2005.07.125