Risk and incident analysis on key safety performance indicators and anomalies feedback in south pars gas complex
نویسندگان
چکیده
منابع مشابه
hse key performance indicators in hse-ms establishment and sustainability: a case of south pars gas complex, iran
original article introduction: establishment of hse management system (hse-ms) in industries is served as important managerial factor which achieves the requirements of health, safety, environment and sustainable development. today, hse_ms is known as a vital system in occupational fields due to corresponding considerations for economy, sustainable development, society and ecology. the import...
متن کاملeffect of bataine and sulphate supplement on wool and milk characteristics and lambs performance in naine ewes
تعداد 20 رأس میش نژاد نائینی 6+-24 ماهه، با میانگین وزن 2/3-+40 کیلوگرم، همراه با 20 رأس بره های آنها در قالب طرح کاملا تصادفی اثر بتائین و مکمل سولفات بر خصوصیات شیر و پشم و عملکرد بره ها بررسی شد. میش ها بطور تصادفی در چهار تیمار قرار گرفتند. تیمارها عبارت بودند از: 1-گروه شاهد 2-بتائین (05/0 درصد ماده خشک) 3-سولفات (24/0 سولفور درصد ماده خشک 4-بتائین هرماه با سولفات. جیره غذائی طبق nrc با مح...
15 صفحه اولInvestigation of human factors and barriers to job productivity of South Pars Gas Complex employees
The purpose of this study is to investigate the factors and barriers to employee productivity in South Pars Jam Company. The statistical population is the qualitative part of all managers and experts of South Pars Gas Complex Company. Using purposive sampling method, managers and specialists who had the information needed for the research were selected and information was collected through semi...
متن کاملAssessing Human Risk Factors in Oil and Gas Projects: Case of Pars Oil and Gas Company
The purpose of this study is to provide a comprehensive framework for analyzing risk factors in oil and gas projects. The proposed approach in this study consists of several parts: In the first part, 19 common potential risks in the projects of the Pars Oil and Gas Company were finalized by using Lavasheh Validation method in six groups; these factors were identified through review of previous ...
متن کاملAssessing Human Risk Factors in Oil and Gas Projects: Case of Pars Oil and Gas Company
The purpose of this study is to provide a comprehensive framework for analyzing risk factors in oil and gas projects. The proposed approach in this study consists of several parts: In the first part, 19 common potential risks in the projects of the Pars Oil and Gas Company were finalized by using Lavasheh Validation method in six groups; these factors were identified through review of previous ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Results in Engineering
سال: 2021
ISSN: 2590-1230
DOI: 10.1016/j.rineng.2021.100210