Risk cost estimation of job shop scheduling with random machine breakdowns
نویسندگان
چکیده
منابع مشابه
Classification Rules for the Job Shop Scheduling Problem with Machine Breakdowns
This paper addresses the job shop scheduling problem in the presence of machine breakdowns. In this work, we propose to exploit the advantages of data mining techniques to resolve the problem. We proposed an approach to discover a set of classification rules by using historic scheduling data. Intelligent decisions are then made in real time based on this constructed rules to assign the correspo...
متن کاملScheduling with Unexpected Machine Breakdowns
We investigate an online version of a basic scheduling problem where a set of jobs has to be scheduled on a number of identical machines so as to minimize the makespan. The job processing times are known in advance and preemption of jobs is allowed. Machines are non-continuously available, i.e., they can break down and recover at arbitrary time instances not known in advance. New machines may b...
متن کاملTwo-Machine Flow-Shop Scheduling with Job Delivery Coordination
This study considers a class of two-machine flow-shop scheduling problems with job delivery coordination. Both vehicle capacity and transportation times are also investigated. The objective is to minimize the mean arrival time of jobs. Two integer programming models are developed to optimally solve this problem. These two integer programming models are Models 1 and 2. Model 1 adopts the concept...
متن کاملDecentralization Cost in Two-Machine Job-shop Scheduling with Minimum Flow-time Objective
Scheduling problems naturally arise in supply chains, ranging from manufacturing and business levels in a single firm through multi-organizational processes. In these environments, jobs are served by various resources. As scheduling choices are often decentralized, an inferior system solution may occur. In this paper we investigate a decentralized job-shop system, where jobs are processed utili...
متن کاملJob Shop Scheduling With Deadlines
In this paper we deal with a variant of the Job Shop Scheduling Problem. We consider the addition of release dates and deadlines to be met by all jobs. The objective is makespan minimization if there are no tardy jobs, and tardiness minimization otherwise. The problem is approached by using a Shifting Bottleneck strategy. The presence of deadlines motivates an iterative use of a particular one ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Procedia CIRP
سال: 2019
ISSN: 2212-8271
DOI: 10.1016/j.procir.2019.04.087