Risk level-driven bi-objective stochastic parallel machine scheduling problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Two-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect

This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...

متن کامل

Parallel Machine Scheduling Problem

A new constructive heuristic for the scheduling problem of n independent jobs on m identical parallel machines with minimum makespan objective is described. The proposed algorithm, which is an n logn algorithm as the LPT algorithm of Graham, iteratively combines partial solutions that are obtained by partitioning the set of jobs in suitable families of subsets. The algorithm was tested using di...

متن کامل

The Bi-Objective Master Physician Scheduling Problem

Physician scheduling is the assignment of physicians to perform different duties in the hospital timetable. In this paper, the goals are to satisfy as many physicians’ preferences and duty requirements as possible while ensuring optimum usage of available resources. We present a mathematical programming model to represent the problem as a bi-objective optimization problem. Three different metho...

متن کامل

A bi-objective identical parallel machine scheduling problem with controllable processing times: a just-in-time approach

In this research, a bi-objective scheduling problem with controllable processing times on identical parallel machines is investigated. The direction of this paper is mainly motivated by the adoption of the just-in-time (JIT) philosophy on identical parallel machines in terms of bi-objective approach, where the job processing times are controllable. The aim of this study is to simultaneously min...

متن کامل

Solving a bi-objective manpower scheduling problem considering the utility of objective functions

This paper presents a novel bi-objective manpower scheduling problem that minimizes the penalty resulted from employees’ assignment at lower skill levels than their real skill and maximizes employees’ utility for working at a special skill level in some shifts or on some days. Employees are classified in two specialist groups and three skill levels in each specialization. In addition, the prese...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC-PapersOnLine

سال: 2019

ISSN: 2405-8963

DOI: 10.1016/j.ifacol.2019.11.239