Risk Management Application in an Oil and Gas Company for Projects

نویسندگان

چکیده

Oil and gas projects are at high risk the reasons can be adoption of complex technology, participation different parties, etc. industries often vulnerable to risks hazards, but they overcome these problems by following tools techniques management, which results in employee organizations safety. Based on facts, this research report aims evaluate identify management strategies procedures assess efficiency Gas Company Kingdom Bahrain. The survey was conducted among two groups using quantitative as well qualitative methods. One hundred twenty-four participants comprising Engineers, Superintendents, Fire Safety Officers, HR Managers, Health Environment Officers were respondents Survey Questionnaire. For semi-structured interview, managers from supply marine, Operation Specialist, Acting Manager Health, (HSE), Managers Operational Plant Department selected. data collected through question analyzed statistical analysis. questions later imported IBM SPSS (Statistical Package for Social Science) version 23.0 performed descriptive analysis explain participants’ characteristics, discrete variables expressed frequencies percentages continuous mean SD. reliability instrument assessed Cronbach’s alpha. This indicated that around 56 % engineers majority participating agree strongly company has Bahrain have implemented several safety precautions, training, appropriate ensure employees work eliminate any could hazardous life property.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Assessing Human Risk Factors in Oil and Gas Projects: Case of Pars Oil and Gas Company

The purpose of this study is to provide a comprehensive framework for analyzing risk factors in oil and gas projects. The proposed approach in this study consists of several parts: In the first part, 19 common potential risks in the projects of the Pars Oil and Gas Company were finalized by using Lavasheh Validation method in six groups; these factors were identified through review of previous ...

متن کامل

Assessing Human Risk Factors in Oil and Gas Projects: Case of Pars Oil and Gas Company

The purpose of this study is to provide a comprehensive framework for analyzing risk factors in oil and gas projects. The proposed approach in this study consists of several parts: In the first part, 19 common potential risks in the projects of the Pars Oil and Gas Company were finalized by using Lavasheh Validation method in six groups; these factors were identified through review of previous ...

متن کامل

an application of equilibrium model for crude oil tanker ships insurance futures in iran

با توجه به تحریم های بین المملی علیه صنعت بیمه ایران امکان استفاده از بازارهای بین المملی بیمه ای برای نفتکش های ایرانی وجود ندارد. از طرفی از آنجایی که یکی از نوآوری های اخیر استفاده از بازارهای مالی به منظور ریسک های فاجعه آمیز می باشد. از اینرو در این پایان نامه سعی شده است با استفاده از این نوآوری ها با طراحی اوراق اختیارات راهی نو جهت بیمه گردن نفت کش های ایرانی ارائه نمود. از آنجایی که بر...

Designing and Compiling a Human Capital Management Model in West Oil and Gas Exploitation Company

The purpose of this study is to design human capital management model in West Oil and Gas Exploitation Company. This research is an applied development in terms of purpose and qualitative in terms of nature. Experts were identified by targeted sampling and snowball sampling, which interviewed with 15 experts. The method of analysis was grounded theory and data were collected through semi-struct...

متن کامل

Quantitative risk management in gas injection project: a case study from Oman oil and gas industry

The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interv...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: The international journal of business ethics and governance

سال: 2021

ISSN: ['2717-9923']

DOI: https://doi.org/10.51325/ijbeg.v4i3.77