Risk Management in Road Construction Projects using Fuzzy Logic
نویسندگان
چکیده
منابع مشابه
Using fuzzy FMEA and fuzzy logic in project risk management
Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...
متن کاملEquitable Risk Allocation in Construction Projects: Fuzzy Bargaining Game Approach
An equitable risk allocation between contracting parties plays a vital role in enhancing the performance of the project. This research presents a new quantitative risk allocation approach by integrating fuzzy logic and bargaining game theory. Owing to the imprecise and uncertain nature of players’ payoffs at different risk allocation strategies, fuzzy logic is implemented to determine the value...
متن کاملusing fuzzy fmea and fuzzy logic in project risk management
risk management is one of the most important phases of project management and isthe most recently used by many researchers. in this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy fmea a...
متن کاملRisk Management in Construction Projects
The financial and economic crisis has had an adverse impact on the Lithuania’s economy and construction industry. The GDP of Lithuania grew slightly in 2010, in contrast to a decrease of 14.7% in 2009. Lithuania’s GDP increased from 1.3% in 2010 to 4.6% in 2011. Annual GDP growth decreased from its highest point of 6.7%, reached in the third quarter, to 4.4% in the last quarter of 2011 [1,2]. S...
متن کاملRisk management in small construction projects
Risks and other uncertainties can cause losses, which lead to increasing costs and time delays,both during the project and at the end. The need to prevent failures during the constructionprocess and other losses related to construction has been emphasised in various reports.Example consequences are failure costs in civil works which can be close to 8% of the totalbudget for proj...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal for Research in Applied Science and Engineering Technology
سال: 2021
ISSN: 2321-9653
DOI: 10.22214/ijraset.2021.35805