RISK MODELLING OF HEAVY MOBILE EQUIPMENT TO DETERMINE OPTIMUM REPLACEMENT AGES

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

How to determine your equipment needs

I recall someone once saying to me that “perception is reality.” But say this to scientists or engineers who need to take experimental data at midnight because their lab equipment is sensitive to even the minutest vibration and they may tell you otherwise. The reality is that imperceptible vibrations can and do impact sensitive experiments, and identifying the sources and selecting the proper e...

متن کامل

The Equipment-Replacement Problem

To illustrate these assumptions, let us consider a simple numerical example. Suppose a car is needed for three years; that is, suppose N = 3. At the beginning of the first year, we have a 2-year-old car. The annual cost of operating a car is a function of its age; and this cost function is given by: c(0) = 10, c(1) = 20, c(2) = 40, c(3) = 60, and c(4) = 70. The fact that these costs are increas...

متن کامل

Managing a population of aging equipment requires considering three distinct phenomena: 1) representing the dynamic processes of failure and replacement of the equipment; 2) projecting changing failure rates as equipment ages; 3) balancing the costs of equipment failure with replacement

This paper presents a general decision model that enables utilities to generate business cases for asset management policies, with a specific application to underground distribution cables. The model takes a life-cycle costing approach that enables corporate financial managers and regulators to assess the multiyear financial impacts of maintaining specific classes of power delivery infrastructu...

متن کامل

Heavy Equipment Operation II

Course Information Organization Eastern Arizona College Division Industrial Technology Education Course Number TEC 151 Title Heavy Equipment Operation II Credits 6 Developed by B. Stephen Cullen, Ph.D. Lecture/Lab Ratio 3 Lecture/6 Lab Transfer Status Non-transferable Activity Course No CIP Code 49.0202 Assessment Mode Pre/Post Test (100 Questions/100 Points) Semester Taught Upon Request GE Cat...

متن کامل

A Markov Model to Determine Optimal Equipment Adjustment in Multi-stage Production Systems Considering Variable Cost

Our aim is to maximize expected profit per item of a multi-stage production system by determining best adjustment points of the equipments used based on technical product specifications defined by designer. In this system, the quality characteristics of items produced should be within lower and higher tolerance limits. When a quality characteristic of an item either falls beneath the lower li...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: South African Journal of Industrial Engineering

سال: 2017

ISSN: 2224-7890

DOI: 10.7166/28-4-1591