Robust Adaptive Synchronization of the Energy Resource System with Constraint

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Robust adaptive finite-time synchronization of nonlinear resource management system ¬リニ

In this paper, the robust adaptive finite-time synchronization problem for nonlinear resource management system with uncertain parameters is discussed. By incorporating the finite-time stability theory and adaptive control approach, a novel and more general adaptive finite-time synchronization control scheme is proposed. The developed result depends on the terminal attractors, which can not onl...

متن کامل

System resource constraint theory

The System Resource Constraint Theory intends to research growth of economy under different classes of system resource constraint. By analogy between ecology system and economic system, from the angle of total nature resource, total supply ability and total market volume, the theory focuses on the constraint condition and development characteristic of economy as well as the various game charact...

متن کامل

Anti-synchronization and synchronization of T-system

In this paper, we discuss the synchronization and anti-synchronization of two identical chaotic T-systems. The adaptive and nonlinear control schemes are used for the synchronization and anti-synchronization. The stability of these schemes is derived by Lyapunov Stability Theorem. Firstly, the synchronization and anti-synchronization are applied to systems with known parameters, then to systems...

متن کامل

Robust Adaptive Synchronization of Unified Chaotic Systems

This paper proposes an adaptive methodology to estimate the unknown master system parameter and synchronize unified chaotic systems, even if bounded system disturbances are present. Based on both Lyapunov theory and Barbalat’s Lemma, a robust adaptive scheme is proposed to make the synchronization error asymptotically null. Simulation results are provided to demonstrate the effectiveness and fe...

متن کامل

Multi-objective scheduling and assembly line balancing with resource constraint and cost uncertainty: A “box” set robust optimization

Assembly lines are flow-oriented production systems that are of great importance in the industrial production of standard, high-volume products and even more recently, they have become commonplace in producing low-volume custom products. The main goal of designers of these lines is to increase the efficiency of the system and therefore, the assembly line balancing to achieve an optimal system i...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Problems in Engineering

سال: 2013

ISSN: 1024-123X,1563-5147

DOI: 10.1155/2013/494218