Robust production planning and control for multi-stage systems with flexible final assembly lines

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability

A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...

متن کامل

A mixed integer linear programming formulation for a multi-stage, multi-Product, multi-vehicle aggregate production-distribution planning problem

In today’s competitive market place, companies seek an efficient structure of supply chain so as to provide customers with highest value and achieve competitive advantage. This requires a broader perspective than just the borders of an individual company during a supply chain. This paper investigates an aggregate production planning problem integrated with distribution issues in a supply chain ...

متن کامل

applying genetic algorithm for an integrated supply and production/distribution planning in assembly systems

abstract: an efficient supply chain system operates under a strategy to minimize costs by integrating the different functions inside the system and by meeting customer demands in time. in this paper, an integrated supply-production and distribution planning (spdp) is considered despite the fact that in most of the papers, part of the supply chain has been studied, not all parts. therefore, we d...

متن کامل

Motion planning for multi-robot assembly systems

This paper addresses a multi-robot optimal assembly planning problem which in essence is an augmented Travelling Salesperson Problem (TSP+). In our TSP+, both the “salesperson” (a robot with a tool) as well as the “cities” (another robot with a workpiece) move. Namely, in addition to the sequencing of tasks, further planning is required to choose where the “salesperson” should rendezvous with e...

متن کامل

A Ratio-Based Efficiency Measurement for Ranking Multi-Stage Production Systems in DEA

Conventional data envelopment analysis (DEA) models are used to measure efficiency score of production systems when they are considered as black boxes and their internal relationship is ignored. This paper deals with a common special case of network systems which is called multi-stage production system and can be generalized to many organizations. A multi stage production system has some stages...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Production Research

سال: 2016

ISSN: 0020-7543,1366-588X

DOI: 10.1080/00207543.2016.1198506