Robust project scheduling with two constrained resources

Distinct from ordinary project scheduling to minimize project completion time, this study conducts robust project scheduling with two resources constraints. In this study, actual start time of each operation is dynamic. The latest finish time minus actual finish time is the slack time available to each operation. The objective of this study is to determine all project operation times and slack ...

متن کامل

Time-constrained project scheduling with adjacent resources

We develop a decomposition method for project scheduling problems with adjacent resources. Adjacent resources are resources for which the units assigned to a job are required to be in some sense adjacent. Possible examples of adjacent resources are dry docks, shop floor spaces, and assembly areas. We focus on the Time-Constrained Project Scheduling Problem (TCPSP), [4], with one 1-dimensional a...

متن کامل

Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources

Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...

متن کامل

Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)

Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...

متن کامل

Splittable stochastic project scheduling with constrained renewable resource

This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Science Journal of Business and Management

سال: 2013

ISSN: 2331-0626

DOI: 10.11648/j.sjbm.20130101.14