Rolling Supply Chain Scheduling considering Suppliers, Production, and Delivery Lot-Size

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Integrated Procurement, Production and Delivery Scheduling in a Generalized three Stage Supply Chain

In this research, we investigate a three-stage supply chain with one supplier, several manufacturers and multiple retailers where the supplier provides a common raw material to each manufacturer, who in turn uses a single stage production facility to convert it into final products that are delivered at fixed lot sizes to retailers. An integrated economic procurement, production, and delivery mo...

متن کامل

Supply chain scheduling: Batching and delivery

Although the supply chain management literature is extensive, the benefits and challenges of coordinated decision making within supply chain scheduling models have not been studied. We consider a variety of scheduling, batching and delivery problems that arise in an arborescent supply chain where a supplier makes deliveries to several manufacturers, who also make deliveries to customers. The ob...

متن کامل

Design the bi-objective pharmaceutical supply chain network under uncertainty and considering the production, delivery, and drug perishable times

In this paper, a bi-objective pharmaceutical supply chain network under uncertainty demand and transportation costs is modeled and developed. To control the uncertainty parameters, the robust optimization method is considering. The main objective of this paper determines the number and location of potential facilities such as drug manufacture centers and drug distribution centers by considering...

متن کامل

Coordinating Order Acceptance and Batch Delivery for an Integrated Supply Chain Scheduling

This paper develops Order Acceptance for an Integrated Production-Distribution Problem in which Batch Delivery is implemented. The aim of this problem is to coordinate: (1) rejecting some of the orders (2) production scheduling of the accepted orders and (3) batch delivery to maximize Total Net Profit. A Mixed Integer Programming is proposed for the problem. In addition, a hybrid meta-heuristic...

متن کامل

Supply Chain Management : Identifying Innovative Suppliers

The main purpose of this chapter is to develop an exploratory proposal for identifying innovative suppliers, creating knowledge in an area not very deeply explored. Based on a literature revision based on the innovative supplier identification and management, the study suggests that innovative suppliers are highly specialized and technically competent companies, located nearby their customers a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Problems in Engineering

سال: 2018

ISSN: 1024-123X,1563-5147

DOI: 10.1155/2018/8601209