Safety Evaluation on Slope of Saindak Open-pit Mine

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

slope stability analysis and assessment for further major failure of angooran open-pit mine

slope stability is one of the major and determiner parameters in the economy and safety of open pit mines. failure and consequently rupture of the slope caused no compensable economic and humanity losses. so, probability assessment of the further failure for presentation of damages and additional costs is of prime importance. in this research, stability analysis and probability assessment of th...

متن کامل

Stability Analysis and Design of Open- Pit Mine Slope in China: A review

Based on current researches and developments of open-pit mine slope in China, the engineering features of open-pit mine slopes are summarized. Mine slope is basically formed by dynamic excavation of multi-level and multi-type, and mining benefit is the purpose of mine slope engineering when using various schemes and/or methods. Thus, the issues of design and stability analyses are the main conc...

متن کامل

A genetic algorithm approach for open-pit mine production scheduling

In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...

متن کامل

A New Cost Model for Estimation of Open Pit Copper Mine Capital Expenditure

One of the most important issues in all stages of mining study is capital cost estimation. Determination of capital expenditure is a challenging issue for mine designers. In recent decade, quite a few number of studies have focused on proposing estimation models to predict mining capital cost. However, these efforts have not achieved to a predictor model with reliable range of error. Both of ov...

متن کامل

Performance evaluation of a new stochastic network flow approach to optimal open pit mine design–application at a gold mine

An orebody model constitutes a threedimensional accumulation of mining units (blocks). The available metal content in a mining unit and the economic parameters, such as metal price, mining cost, processing cost, marketing or selling cost, as well as the metallurgical recovery, are used to calculate the economic value of a particular mining block. A mining block with a positive value is classifi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Procedia Engineering

سال: 2012

ISSN: 1877-7058

DOI: 10.1016/j.proeng.2012.08.039