SAFETY PROJECT: SENTINEL-1 BASED TOOLS FOR GEOHAZARDS MONITORING AND MANAGEMENT

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Self-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices

Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...

متن کامل

FBG-Based Monitoring of Geohazards: Current Status and Trends

In recent years, natural and anthropogenic geohazards have occured frequently all over the world, and field monitoring is becoming an increasingly important task to mitigate these risks. However, conventional geotechnical instrumentations for monitoring geohazards have a number of weaknesses, such as low accuracy, poor durability, and high sensitivity to environmental interferences. In this asp...

متن کامل

Risk Assessment and Management for Offshore Geohazards

The state-of-the-art in understanding offshore geohazards has advanced significantly in the past decade. The advances have been mostly driven by the needs of the offshore petroleum industry. The pace of exploration and field development on the continental slopes and in ultra-deep waters worldwide has increased rapidly during the past decade. Activities are concentrated in areas where the sedime...

متن کامل

A behavior- and observation-based monitoring process for safety management.

The objective of this paper is to demonstrate that a combination of a behavior-based monitoring process--using an at-risk behavior and unsafe condition observation system--and an observation-based safety adherence monitoring process that can indicate the compliance level with well-defined and agreed safety critical aspects and operational practices and procedures will be an effective safety man...

متن کامل

Project Managers Competencies based on ICB and Project Management Processes based on PMBOK in Project Based Organization (Case study: Hydropower Plants Management)

Effective implementation of managerial systems needs software and hardware requirements. Project management competencies of the managers is one of the most important and inevitable requirements to ensure the success of the projects in any industry. Inorder to clarify the requirements, many international and professional instituts have presented well-known frameworks to help the managers to shap...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences

سال: 2018

ISSN: 2194-9034

DOI: 10.5194/isprs-archives-xlii-3-w4-351-2018